OPERATIONS & PROJECTS
Mines, quarries, pilots & hubs in Alberta
Every extraction operation and advanced project the Atlas tracks, with status as of October 2026, operator, scale, notes and a source. Each has its own page and a pin on the integrated map.
Oil sands mine
Suncor Base Plant (Millennium / North Steepbank)
Base Mine Extension (225 kbbl/d froth) proposed as replacement; Upgrader 1 had a 67-day outage in 2025.
- Operator
- Suncor
- Scale
- ≈260 kbbl/d bitumen (5-yr avg); mines wind down early 2030s
Fort Hills
Q3 2025 record 184 kbbl/d.
- Operator
- Suncor (100 %)
- Scale
- ≈174–180 kbbl/d (2025); nameplate 194 kbbl/d
Syncrude Mildred Lake (North Mine + MLX-West)
Mildred Lake Extension West first oil April 2025 extends life ≈14 years.
- Operator
- Syncrude (Suncor-operated)
- Scale
- Upgrader ≈335 kbbl/d SCO (2025 record)
Syncrude Aurora North
Feeds Mildred Lake upgrader.
- Operator
- Syncrude
- Scale
- Nameplate 225 kbbl/d
Canadian Natural Horizon
Reliability debottleneck adds 6.3 kbbl/d in fall 2027.
- Operator
- Canadian Natural
- Scale
- Nameplate 314 kbbl/d bitumen; ≈280 kbbl/d SCO (2025)
Kearl
Diluted bitumen, no upgrader; Q3 2025 record 316 kbbl/d.
- Operator
- Imperial (71 %) / ExxonMobil
- Scale
- ≈280 kbbl/d (2025); 2026 guidance ≈290 kbbl/d
Muskeg River (Albian)
100 % CNRL after the Shell asset swap.
- Operator
- Canadian Natural
- Scale
- Nameplate 183 kbbl/d
Jackpine (Albian)
Froth-treatment tailings here and at the other mines carry 43–72 kt/yr of monazite plus Ti–Zr heavy minerals (AGS INF 157).
- Operator
- Canadian Natural
- Scale
- Nameplate 145 kbbl/d
Coal mine
Vista (Phase I + Phase II)
AER granted Phase II permits 20 Jul 2026 (+630 ha); provincial EIA complete June 2026; planned closure 2032.
- Operator
- Coalspur Mines (Bighorn / Cline Group)
- Scale
- ≈7.5–9 Mt/yr run-of-mine; export to Japan & Korea
Coal Valley (Pit 26)
Care-and-maintenance 2020; 68 ha Pit 26 extension applied 2025.
- Operator
- Prairie Mines & Royalty (Westmoreland)
- Scale
- ≈1.6 Mt run-of-mine (2025), low rate
Grande Cache (No. 8 Mine)
Alberta's only producing met-coal mine; operational disruptions in 2025.
- Operator
- CST Canada Coal
- Scale
- ≈0.5–1.3 Mt/yr met coal to South Korea
Summit Mine 14 (underground)
AER approvals 24 Sep 2025; Court of Appeal granted leave to appeal 25 Nov 2025.
- Operator
- Summit Coal (Valory Resources)
- Scale
- ≈1.2–1.3 Mt/yr planned; opening ≈2027
Dodds Coal Mine (Ryley)
Only Plains coal mine still producing after the coal-power phase-out.
- Operator
- Dodds Coal Mining
- Scale
- Very small domestic heating coal
Genesee
Closed with the Genesee gas conversion; fly ash up to 1,399 ppm REO characterized (AGS INF 157).
- Operator
- Westmoreland / Capital Power
- Scale
- Closed June 2024
Highvale
Formerly Canada's largest surface coal mine; fly ash now beneficiated for cement (Lafarge / TransAlta).
- Operator
- TransAlta
- Scale
- Closed Dec 2021; reclamation to 2046
Sheerness (humalite)
7,000 ha under reclamation.
- Operator
- Westmoreland
- Scale
- Humalite soil amendment since 2021; coal closed
Cheviot / Cardinal River
Active reclamation.
- Operator
- Teck → Elk Valley Resources (Glencore)
- Scale
- Closed June 2020; ≥C$200 M reclamation
Grassy Mountain
AER approved exploration and water diversion 15 May 2025; water licence contested.
- Operator
- Northback Holdings (Hancock)
- Scale
- Redesigned ≈2.5 Mt/yr; application expected end-2026
Quarry
Exshaw cement plant & quarry
Expanded from 1.3 Mt/yr in 2013–16; largest cement plant in western Canada.
- Operator
- Lafarge Canada (Holcim)
- Scale
- 2.2 Mt/yr cement
Exshaw lime plant & quarry
Quicklime, hydrated lime and pulverized limestone for oil sands, water treatment and steel.
- Operator
- Graymont
- Scale
- Two rotary preheater kilns (capacity unpublished)
Cadomin Quarry
Edmonton plant's full-scale CCS (≈1 Mt/yr, up to C$2 B) paused August 2026 on weak carbon prices.
- Operator
- Heidelberg Materials
- Scale
- Rail-fed limestone for Edmonton cement plant
Thunderstone Rundle rock quarry (Canmore)
Rundle rock since 1960.
- Operator
- Thunderstone Quarries
- Scale
- Dimension and landscape stone
Salt / brine
Lindbergh salt plant
Operating since 1948 on a ≈300 m Lotsberg salt bed; 2025–26 output not published.
- Operator
- Windsor Salt (Stone Canyon)
- Scale
- Solution-mined vacuum salt (≈140 kt/yr historic capacity)
Fort Saskatchewan brine & cavern fields
Dow chlor-alkali closed 2006; caverns now storage assets for the Industrial Heartland.
- Operator
- Dow, ATCO Energy Solutions, Keyera
- Scale
- Lotsberg caverns for NGL, ethylene and hydrogen storage
Silica sand
Peace River frac-sand quarry
Paddy Member quartz sand; took over from Canadian Silica Industries in 2022.
- Operator
- Source Energy Services
- Scale
- ≈1.0 Mt/yr nameplate (2025); plan to 3 Mt/yr
Sil Industrial Minerals — Bruderheim
Glaciofluvial quartz sand; largest industrial sand producer in Canada per company.
- Operator
- Sil Industrial Minerals
- Scale
- Frac, filtration, glass and abrasive sands (>6,000 t/d claimed)
Firebag silica (AMI Silica)
Surface Material Lease approved 2014; not developed.
- Operator
- Athabasca Minerals / AMI Silica (Badger Mining)
- Scale
- ≈16 Mt resource; 1 Mt/yr target
Industrial mineral
Korite ammolite mines (St. Mary River)
Bearpaw Formation K-zone; emerged from CCAA 2020.
- Operator
- Korite International (Buffalo Rock Mining)
- Scale
- >42 M carats since 2003; ≈90 % of world ammolite
Sun Gro peat (Seba Beach / Vilna / Julius Lake)
Julius Lake West bog harvest 2024/25–2038.
- Operator
- Sun Gro Horticulture
- Scale
- Alberta ≈17 % of Canadian peat (C$69 M sales, 2013)
Metiskow / Horseshoe Lake sodium sulphate
No demand for decades; Saskatchewan dominates.
- Operator
- Alberta Sulphate (historic)
- Scale
- Closed; plant ran from 1969
Aggregate pit
Lithium brine
E3 Lithium — Clearwater (Bashaw District)
Demonstration plant Phase 2 commissioned June 2026; Directive 056 facility licence filed; Sedgman FEED.
- Operator
- E3 Lithium
- Scale
- 16.2 Mt LCE M&I @ 75.5 mg/L; Phase 1 12 ktpa Li2CO3 (2028/29)
E3 Lithium — Garrington
Resource June 2025.
- Operator
- E3 Lithium
- Scale
- 5.0 Mt LCE M&I + 0.3 Mt inferred @ 54 mg/L
LithiumBank — Boardwalk
150 m³ bulk brine sample April 2026; FS/FEED mid-2027; production 2029–30.
- Operator
- LithiumBank Resources (SLB FS/FEED)
- Scale
- 5.2 Mt LCE M&I + 2.78 Mt inferred @ 81.6 mg/L; 2 × 5 ktpa modules
LithiumBank — Park Place
Trimmed from 21.7 Mt after lease rationalization.
- Operator
- LithiumBank Resources
- Scale
- 15.1 Mt LCE inferred @ 80 mg/L
NeoLithica — Peace River lithium
AER ST98 counts it toward 14–15 kt/yr Li2CO3 from 2028.
- Operator
- NeoLithica
- Scale
- 10 Mt LCE inferred @ 70 mg/L
Rainbow Lake lithium (Keg River / Sulphur Point)
Company refocused on US brines in 2025.
- Operator
- LibertyStream (formerly Volt Lithium)
- Scale
- 4.3 Mt LCE inferred @ 51 mg/L
Helium
Steveville helium plant
Alberta's first commercial helium plant; non-operational since fall 2024; CCAA Feb 2025, Keranic acquisition 2025; restart status unverified.
- Operator
- Keranic Industrial Gas (ex-Royal Helium)
- Scale
- Design 22 MMcf/yr 99.999 % He from 15 MMcf/d raw gas
First Helium — Worsley 15-25
Discovery well awaiting facility financing; second exploration well licensed 2026.
- Operator
- First Helium
- Scale
- 1.3 % He, 26 % N2; 2 MMcf/d test; 323 MMcf He contingent
Avanti Helium — Greater Knappen (Alberta)
First production on the Montana (Sweetgrass) side in 2026.
- Operator
- Avanti Helium
- Scale
- Historic Cambrian show 2.18 % He / 96 % N2
Geothermal
Alberta No. 1 geothermal (Greenview)
Seeking equity; 4 km wells into Leduc / Granite Wash.
- Operator
- Terrapin / No. 1 Geothermal LP
- Scale
- 10 MWe + 985 TJ/yr heat planned
FutEra Swan Hills geothermal–gas hybrid
Closed-loop pilot funded C$5 M by ERA (Mar 2026).
- Operator
- FutEra Power (Razor / AIMCo)
- Scale
- 21 MW hybrid; Canada's only geothermal power plant
Eavor-Lite closed-loop demo (Rocky Mountain House)
C$8 M ERA award (Jul 2026) for Eavor-Jules superhot drilling.
- Operator
- Eavor Technologies
- Scale
- Demo 2019–2024; commercial Eavor-Loop in Germany (Dec 2025)
Latitude 53 geothermal greenhouse (Hinton)
Named by AER as a growth project.
- Operator
- Novus Earth
- Scale
- ≈3 MWe + greenhouse heat
CCS hub
Quest CCS (Scotford)
Basal Cambrian Sandstone 2,105–2,132 m.
- Operator
- Shell (operator) / Canadian Natural
- Scale
- ≈1 Mt/yr; 9.8 Mt stored since 2015
Alberta Carbon Trunk Line / Clive
Sources: Nutrien Redwater and Sturgeon Refinery; Enhance Origins permanent hub due 2026.
- Operator
- Wolf Midstream / Enhance Energy
- Scale
- 14.6 Mt/yr line capacity; 1.4 Mt stored 2024; ≈8 Mt cumulative
Shell Polaris capture + Atlas storage hub
FID June 2024; 22 km pipeline to two injection wells.
- Operator
- Shell / ATCO EnPower
- Scale
- 650 kt/yr capture; start-up ≈end 2028
Open Access Wabamun Carbon Hub
Both anchor emitters stalled (Genesee CCS cancelled 2024; Heidelberg on hold Aug 2026).
- Operator
- Enbridge / First Nations Capital Investment Partnership
- Scale
- ≈4 Mt/yr planned; target 2027
Pathways / Oil Sands Alliance CCS hub (Cold Lake)
Trilateral MOU 2 Jul 2026; definitive agreements by 15 Nov 2026; C$20–30 B.
- Operator
- Oil Sands Alliance (CNRL, Cenovus, ConocoPhillips, Imperial, Suncor)
- Scale
- 6 Mtpa net by 2035, +10 Mtpa by 2045; in service 1 Jan 2032
Hydrogen
Air Products Edmonton net-zero hydrogen complex
Cost escalated to ≈US$3.3 B.
- Operator
- Air Products
- Scale
- 1,500 t/d H2 with capture; start late 2027
Dow Path2Zero (Fort Saskatchewan)
C$10–11.5 B; CO2 via ACTL; Linde hydrogen plant.
- Operator
- Dow / Linde
- Scale
- 1,285 kt/yr ethylene + PE Phase 1 (late 2029); Phase 2 2030
Critical-minerals recovery
Froth-treatment tailings heavy minerals (Ti–Zr–REE)
Horizon FEED completed 2019; no FID; AGS INF 157 (Jan 2026).
- Operator
- CVW CleanTech (ex-Titanium Corp) / AGS studies
- Scale
- ≈220 kt/yr TiO2 + 80 kt/yr zircon potential; 43–72 kt/yr monazite
Sultech / Canlin micronized sulphur plant
Location approximate (Caroline area gas plant).
- Operator
- Sultech / Canlin Energy
- Scale
- 50 kt/yr micronized sulphur fertilizer (2027)
Metallic exploration
Clear Hills iron–vanadium (Rambling Creek)
AGS INF 155: 1.116 Mt V2O5 indicated over 84 km²; no activity found 2024–26.
- Operator
- Ironstone Resources (dormant)
- Scale
- 557.7 Mt @ 33.3 % Fe, 0.20 % V2O5 indicated (SRK 2012)
SBH / Buckton polymetallic black shale
Updated NI 43-101 April 2026; C$12 M program planned.
- Operator
- Critical Minerals Americas
- Scale
- Historical 534 kt TREO inferred; 19–29 Bt exploration target
Andrew Lake – Charles Lake shield showings
Only exposed Precambrian in Alberta; AGS OFR 2025-08/09 and 2026-04.
- Operator
- AGS mapping / junior permits
- Scale
- 88 occurrences; AGS 2025 fieldwork 370 sites