ENERGY TRANSITIONCanada critical mineralAlberta priority
Lithium (oilfield brines)
82.5 Mt LCE in place in Devonian reef brines — the largest lithium resource statement in Canada, waiting on DLE economics.
The AGS puts 82.5 Mt of lithium carbonate equivalent in place in Leduc and Swan Hills formation water above a 50 mg/L cut-off, 62 Mt of it already under lease. E3 Lithium's Clearwater project (16.2 Mt LCE measured and indicated at 75.5 mg/L) commissioned its second demonstration phase in June 2026 and targets 12 kt/yr of lithium carbonate from 2028/29. Direct lithium extraction from hot, already-produced brines is the technology bet; price and an unsettled brine royalty are the risks.
1 subsurface asset priced by the Atlas engine: economic value $2B. Move the Scenario Laboratory sliders on the map to reprice.
Devonian Brines — Leduc / Beaverhill Lake0.42 Mt in place · recoverable $3B · economic $2B (91% clears break-even)
GEOLOGY: WHAT MAKES A DEPOSIT MORE LIKELY
Lithium enriched in hot, saline Devonian carbonate formation water; recovered by direct lithium extraction (sorbent / ion exchange) from re-entered or purpose-drilled wells with brine reinjection.
Host formations
Leduc · Swan Hills / Slave Point · Nisku · Keg River / Sulphur Point · Wabamun (potential)
Depth range
2K–4K m
Favourable conditions
Dolomitized reef aquifer with high permeability and large connected pore volume (Clearwater aquifer ≈200 m thick)
Lithium above 50 mg/L (project grades 54–82 mg/L) with manageable Mg, Ca and TDS for DLE
Reservoir temperature 60–110 °C that speeds sorbent kinetics
Dense legacy well control, produced-water handling and gas for power already in place
Discriminating datasets first, then every catalogued public dataset tagged to this commodity. Verified endpoints draw directly; link-only entries open the publisher page.
3D Provincial Geological Framework: Precambrian subcrop zonesAlberta Geological Survey · Structure, depth & isopach · drawable · verifiedEntry point to the provincial 3D framework: which Paleozoic zone sits on basement controls helium traps, brine aquifers and storage seals.Source ↗
Subsurface temperature points (BHT-derived)Alberta Geological Survey · Geothermal · drawable · verifiedThermal gradient for geothermal doublets and for DLE kinetics in lithium brines; basement temperature grids exist as LERC tiles.Source ↗
Metallic & industrial minerals agreementsAlberta Energy and Minerals · Mineral tenure · drawable · verifiedLithium, salt, silica, limestone and metallic tenure; about 2 million ha are under lithium leases.Source ↗
Active producing wells (Alberta Energy Geoview)Alberta Energy and Minerals · Wells · link only · verifiedWhere hydrocarbons are flowing today: live reservoir pressure, produced-water (brine) access, helium-bearing gas streams and infrastructure for re-entry.Source ↗
AER Map-90 oil & gas fields (digitized)Alberta Energy Regulator (digitized) · Known reserves · drawable · verifiedWhere established pools sit; brine, helium and CO2 storage ride on the same reservoirs.Source ↗
Alberta earthquake catalogue (incl. induced)Alberta Geological Survey · Seismic & crustal transects · drawable · verifiedInduced-seismicity hazard zones (Fox Creek, Red Deer) constrain hydraulic fracturing and injection.Source ↗
Brine-hosted mineral lease: 10-year initial term, indefinite while producing, $3.50/ha rent, minimum bonus $10/ha; brine-hosted licence for exploration.
Royalty
No Alberta brine-lithium royalty rate set as of Oct 2026 (lease-by-lease pending regulation; salt royalty of $0.45/t may apply to minerals recovered in salt form). New minerals investment incentive announced Mar 2026 for 2027.
Lead time
3–4 years from feasibility to first carbonate
Permitting path
AER Directive 090 (brine-hosted minerals) and Brine-Hosted Mineral Resource Development Rules (Mar 2023)
LithiumBank — Park PlaceLithium brine · LithiumBank Resources · 15.1 Mt LCE inferred @ 80 mg/LExploration (2026)Trimmed from 21.7 Mt after lease rationalization.Source ↗
NeoLithica — Peace River lithiumLithium brine · NeoLithica · 10 Mt LCE inferred @ 70 mg/LExploration (2026)AER ST98 counts it toward 14–15 kt/yr Li2CO3 from 2028.Source ↗
Rainbow Lake lithium (Keg River / Sulphur Point)Lithium brine · LibertyStream (formerly Volt Lithium) · 4.3 Mt LCE inferred @ 51 mg/LIdled (2026)Company refocused on US brines in 2025.Source ↗